Upolu Wetland Studies

Client:  Ministry of Works, Transport and Infrastructure (Samoa)

Role:  Feasibility Study – Design of Coastal Infrastructure Works

Feasibility Study to examine the site conditions necessary for the construction of new road box culverts to enable lagoon flushing for the wetlands at Satuimalufilufi and Apolima-uta on the island of Upolu. It included the analysis of tidal water levels, existing topography and tidal cycle dynamics for the determination of appropriate lagoon flushing infrastructure.